How do you quote a job in Australia?
How do you quote a job? The short answer
You quote a job by adding up your labour, your materials with markup, and any extras. Add GST if you are registered. Put a valid-until date on it and send it in writing.
Here are the seven steps. The next section explains each one.
- Get the details.
- Write the scope.
- Work out labour.
- Add materials and markup.
- Add extras.
- Add GST if you are registered.
- Set terms and a valid-until date.
What are the steps to write up a quote for a job?
The steps run from the first call to the sent quote. Do them in order and you will not forget a cost. The pricing sum is simple. Here it is.
1. Get the details
Visit the site, or ask the customer to send photos. Ask what they want done and by when. Write down the address and their contact details.
Phone calls come in while you are on the tools. An AI assistant that takes the job details for you can catch them. You can also text back missed calls so the quote request isn't lost.
2. Write the scope
The scope is a plain list of what you will do. Also list what you will not do. This stops arguments later.
3. Work out labour
Guess the hours the job will take. Multiply by your hourly rate. Add time for travel and clean-up if you charge for it.
4. Add materials and markup
List the parts and what they cost you. Then add your markup. Markup covers your time to buy, pick up and carry the stock.
5. Add extras
Extras are things like a call-out fee, tip fees, hire gear or a permit. Put each one on its own line. Customers like to see where the money goes.
6. Add GST if you are registered
Only GST-registered businesses charge GST. If you are registered, show if the price includes GST. The ATO says most businesses must register once turnover reaches a set amount. Check the current amount on the ATO website.
7. Set terms and a valid-until date
Say how and when you want to be paid. Say how to accept the quote. Add a valid-until date, because material prices can change.
General information only, not legal or tax advice. Check with the ATO or your accountant. The ATO rules for tax invoices are different to quotes.
What does a worked example look like?
Craig is a sparkie in Penrith, NSW. Leanne wants six downlights and one new power point. Here is how Craig prices it. Every figure is made up, so it is example only, not a suggested rate.
| Line | Working | Amount |
|---|---|---|
| Labour | 6 hours × $95 | $570.00 |
| Materials | $180 cost + 20% markup | $216.00 |
| Call-out | One visit | $80.00 |
| Subtotal | Add the three lines | $866.00 |
| GST | 10% of subtotal | $86.60 |
| Total | Subtotal + GST | $952.60 |
Example only. Not a suggested rate. Electrical work must be done by a licensed electrician. This example shows the maths, not how to do the job.
Craig is GST-registered, so he adds GST. A tradie who is not registered would stop at the subtotal. Sparkies can also read our page of help for electricians. Plumbers, see plumbers. Building work? See builders.
Is there a free quote template I can copy?
Yes. The box below is a plain-text quote you can copy and paste into an email, text or your invoicing tool. Fill in the square brackets. Delete any line that does not apply to you.
QUOTE [Your business name] ABN: [your ABN] Licence no.: [if your trade needs one] Quote no.: [number] Date: [date] Valid until: [date] For: [Customer name] Job address: [address] 1. SCOPE [What you will do, in plain words] 2. PRICE Labour: [hours] x $[rate] = $[amount] Materials: [list] = $[amount] Call-out: $[amount] Other extras: $[amount] Subtotal: $[amount] GST (if registered): $[amount] TOTAL: $[amount] [incl. / excl.] GST 3. NOT INCLUDED [Things you will not do or supply] 4. PAYMENT Deposit: [amount or "none"] Balance: [when and how to pay] 5. HOW TO ACCEPT Reply "YES" to this message, or sign and send back. 6. CHANGES Any change to the job is agreed in writing, with the new price, before the extra work starts. Thanks, [Your name], [phone]
Check what your state and trade require. This template is a starting point, not legal advice.
What should a quote include, and what should you leave out?
A good quote includes the scope, the price, the dates and the terms. Leave out vague words, guesses you cannot back and anything you do not mean to do. The table shows the split.
| Put in | Leave out |
|---|---|
| A clear scope of work | Vague words like "and so on" |
| Labour and materials on separate lines | One lump sum with no detail |
| What is not included | Promises you cannot keep |
| A valid-until date | An open-ended price |
| Payment terms | Surprise fees later |
| How to accept | Pressure or fake deadlines |
Run through this list before you press send. Screenshot it or print it.
☐ 1. Business name and ABN are on it ☐ 2. Licence number is on it, if your trade needs one ☐ 3. Customer name and job address are right ☐ 4. Quote number and date are on it ☐ 5. Valid-until date is on it ☐ 6. Scope says what you will do ☐ 7. Labour and materials are listed ☐ 8. Things not included are listed ☐ 9. GST is shown, if you are registered ☐ 10. Total price is clear ☐ 11. Deposit and payment terms are clear ☐ 12. It says how to accept, and how changes work
Should you send a quote or an estimate?
Send a quote when you can fix the price. Send an estimate when you cannot know the full cost yet. A quote is a fixed price. An estimate is a best guess.
| Quote | Estimate | |
|---|---|---|
| What it is | A fixed price | A best guess |
| Use it when | The job is clear | The scope may change |
| Example | Fit six downlights | Fix a leak behind a wall |
| Risk | You carry cost blow-outs | The customer may be surprised |
A fixed quote can bind you to that price. Read the guidance on business.gov.au and the ACCC site. Be clear with customers which one you are sending.
General information only, not legal advice.
How do you follow up a quote?
Follow up with a short, polite message two days after you send the quote. Send a second one at day five and a last check-in at day ten. Each message should be about that quote only and give an easy way to say no.
Many tradies skip this step. Quiet customers are often just busy. A gentle nudge is part of good quote follow-up.
Day 2: a friendly text
Hi [Name], it's [Your name] from [Business]. Just checking you got the quote for [job] on [date]. Happy to answer any questions. If it's not for you, no worries. Just reply NO THANKS.
Day 5: a short email
Subject: Your quote for [job] Hi [Name], I sent you a quote for [job] on [date]. It is valid until [date]. If you have questions about the price or the scope, just reply and I will sort them out. If you have gone with someone else, that is fine. Let me know and I will close it off. Thanks, [Your name] [Business] · [phone]
Day 10: a last check-in
Hi [Name], [Your name] from [Business] again. Your quote for [job] runs out on [date]. After that I may need to re-price it. If you would like to go ahead, reply YES. If not, reply NO THANKS and I will not message again about this quote.
These messages only cover the quote the customer asked for. Do not add offers or ads. Ongoing marketing texts and emails need consent and an unsubscribe option. Read about the Spam Act 2003 and the ACMA website. Always honour a reply STOP or NO THANKS.
Reviews come after the job is done. Our review request templates for after the job can help. Want a number on missed calls? Try the calculator to work out what missed calls cost you. If you take quote requests online, a website with a simple quote request form helps.
Do this today
- Copy the Aussie Quote Template and save it on your phone or computer.
- Put a valid-until date on every quote you send from now on.
- Set a phone reminder for day 2, day 5 and day 10 for each quote you send.
Questions about quoting a job
Should my quote show GST?
Only if you are registered for GST. If you are, show whether the price includes GST. If you are not registered, do not add GST. Most businesses must register once turnover reaches the ATO threshold, so check the ATO site.
More: ATO.
How long should a quote be valid for?
There is no single rule. Many tradies use 14 or 30 days. Costs like materials can change, so put a valid-until date on every quote. After that date, you can re-price the job.
Should I charge for quotes?
It is up to you. Many tradies quote for free on small jobs. For big or complex jobs, some charge a fee for a detailed quote. Tell the customer before you start, and say if the fee comes off the job.
Quote or estimate: which one should I send?
Send a quote when you can fix the price. Send an estimate when the scope is unclear, like hidden damage or a renovation. A fixed quote can bind you, so read the official guidance first.
More: business.gov.au and the ACCC.
What if the job changes after they say yes?
Agree any change in writing before you do the extra work. A text or email that says what changed and the new price is a good start. Check your state's rules too. This is not legal advice.
More: your state regulator, such as NSW Fair Trading.
Want quote follow-ups handled for you?
Everyday Work sets up an AI assistant that answers calls and website chats. It always says it is an AI, takes the details and sends you the lead. You make every call-back and set every price. We can also set up your quote follow-ups.
Free 20-minute Enquiry & Follow-up Check, then a short written action plan. Paid setup is quoted separately. No obligation.